2-9-8-snyatie-i-ustanovka-vsekh-kryshek-cepejj-privoda.html
2.9.8. Removal and installation of all covers of chains of a drive
|
|
Fig. 2.403. Components of covers приводных chains: 1 – M6 – 10 Нм; M8 – 22 Нм; 2 – a sealing cuff; 3 – a compensatory washer; 4 – the adjusting plug; 5 – теплоизоляционный a guard; 6 – a bolt 10 Нм; 7 – a sealing cuff; 8 – a bolt 10 Нм; 9 – a sealing flange; 10 – a bolt 10 Нм; 11 – the gauge of a hall 2; 12 – a sealing ring; 13 – a bolt 10 Нм; 14 – a bolt 10 Нм; 15 – the left cover driving chains; 16 – a lining; 17 – a bolt 4 Нм; 18 – a bolt 10 Нм; 19 – the Hall gauge; 20 – a sealing ring; 21 – a bolt 10 Нм; 22 – the right cover driving chains; 23 – a lining; 24 – a bolt 4 Нм; 25 – a bolt 10 Нм; 26 – теплоизоляционный a guard; 27 – a bolt 10 Нм; 28 – a sealing cuff; 29 – a sealing flange; 30 – a bolt 10 Нм; 31 – the adjusting plug; 32 – the bottom cover driving chains
|
Remove
Put the adaptation for откачки oils under the engine and merge engine oil.
|
THE NOTE
At installation again establish on former places all fixing elements of the cables which removed or have been cut off during dismantling.
|
Remove the engine.
Disconnect the engine from a transmission.
Leave the engine on an elevating table or fix it at the adjusting stand.
Remove a two-mass flywheel and-or a conducted disk.
Disconnect electric штекерное connection 1 from the module of management throttle заслонки.
|
|
Fig. 2.404. Electric штекерное connection of the module of management throttle заслонки and a hose of system of ventilation картера
|
Disconnect a hose of 3 systems of ventilation картера, being on an inlet collector ( fig. 2.404).
|
THE NOTE
Poses. 2 in attention do not accept.
|
Remove штекерные sockets 1, 2, 5 and 6 in a direction forward from arms of an inlet collector.
Separate electric штекерные connections 3 and 4 ( fig. 2.405).
Disconnect штекерные pads 1 and 5 from atomizers.
On cars with a return fuel highway remove a vacuum highway 4 from a regulator of pressure of fuel.
Turn out fixing bolts 2 and 3 fuel stages ( fig. 2.407).
Remove a fuel stage together with atomizers from an inlet collector gradually in a direction upwards.
|
THE NOTE
Reliably protect the removed atomizers from pollution.
|
|
|
Fig. 2.408. Fastening of a back left earring of the engine
|
Turn away a back left earring of the engine ( fig. 2.408).
Turn off an inlet collector and remove it ( fig. 2.409).
|
THE NOTE
Inlet channels GBTS close pure rags.
|
Turn off a cover of the case of the oil filter ( fig. 2.410).
Take a replaceable element of the oil filter.
Pump out engine oil by means of the adaptation for откачки oils from the case of the oil filter.
|
THE NOTE
Put rags on the case of the oil filter to absorb leaking engine oil.
|
Unscrew bolts.
Unscrew bolts 1 and 2.
Put the adaptation for откачки oils under.
Remove a return highway from the pump of the hydraulic booster of a wheel ( fig. 2.412).
|
|
Fig. 2.413. A naprvljajushchaja tube маслоизмерительного probeа
|
Turn off directing tube маслоизмерительного probeа from a head of the block of cylinders and take it upwards ( fig. 2.413).
Unscrew bolts 1 and 2.
Turn on шланговые collars and disconnect the left pipe of a cooling liquid from hoses ( fig. 2.414).
Unscrew bolts 1 and 2.
Turn on шланговые collars and disconnect the right pipe of a cooling liquid from hoses ( fig. 2.415).
|
|
Fig. 2.416. The shtekernyj socket of the gauge of temperature of a cooling liquid is burnt down also with electroconductings from a back pipe of a cooling liquid
|
Disconnect штекерный a socket 2 gauges of temperature of a cooling liquid ( fig. 2.416).
Turn away a nut 1 and remove burn down electroconductings from a back pipe of a cooling liquid.
Unscrew bolts 2–5.
Remove a back tube of system of cooling ( fig. 2.417).
|
THE NOTE
Poses. 1 and poses. 6 in attention do not accept.
|
Turn out fixing bolts of 1-4 combined valves of giving of secondary air ( fig. 2.418).
Turn off nuts 1–12 and remove the left final collector ( fig. 2.419).
Remove the left heat-shielding screen ( fig. 2.420).
Unscrew nuts 1–12 and remove the right final collector ( fig. 2.421).
Remove the right heat-shielding screen ( fig. 2.422).
Turn out bolts 5 and 6 left ГБЦ.
Disunite sockets 1–4.
|
THE NOTE
For extraction use a stripper.
|
Remove a ventilation hose картера the engine.
Unscrew bolts of a cover left ГБЦ in sequence 15–1 ( fig. 2.424).
Uncover ГБЦ.
Unscrew bolts 5 and 6 on right ГБЦ.
Take ignition coils.
Remove a ventilation hose картера the engine.
Unscrew bolts of a cover right ГБЦ in sequence 15–1 ( fig. 2.425).
Uncover ГБЦ.
Disconnect sockets of gauges of the Hall from both parties GBTS ( fig. 2.426).
Turn away cables of weight from right ГБЦ ( fig. 2.427).
Will put a plait of wires aside.
|
|
Fig. 2.428. Fastening of the left cover driving chains
|
Unscrew bolts 1–6 and remove the left cover driving chains ( fig. 2.428).
|
|
Fig. 2.429. Fastening of the right cover driving chains
|
Unscrew bolts 1–6 and remove the right cover driving chains ( fig. 2.429).
Unscrew bolts 1–13 and remove the bottom cover driving chains ( fig. 2.430).
Выпрессуйте a sealing ring of a cranked shaft behind from a cover.
Installation
Remove the hermetic rests on covers приводных chains and the block of cylinders (a head of the block of cylinders), for example, a rotating brush-nozzle with a plastic bristle.
|
THE NOTE
Replace linings, sealing rings and sealing rings of round section.
At return installation establish all cable couplers where they have been established initially.
|
Clear landing surfaces; on them there should not be an oil and greasings.
Cut off a tube nouse on a forward mark (diameter of an aperture about 1 mm).
|
THE NOTE
Covers приводных chains should be установленыв a current of 5 mines after hermetic drawing.
|
|
|
Fig. 2.431. The scheme of drawing of hermetic on a landing surface of the bottom cover driving chains
|
Put platens of hermetic 1–6 on a pure landing surface of the bottom cover driving to a chain, as is shown in drawing 2.431.
Thickness of the platen of hermetic: 1,5–2,0 mm.
Check up, whether there are 2 directing plugs in the block of cylinders, if necessary insert them.
Establish the bottom cover of a chain of a drive and tighten bolts how it is specified more low ( fig. 2.430):
1 – tighten bolts 11, 12, 13 with the moment 10 Нм;
2 – tighten bolts 1, 3, 4, 5, 6, 7, 8, 9, 10 with the moment 10 Нм;
3 – tighten bolts 4, 8, 9, 10 with the moment 22 Нм;
4 – tighten bolts 2 pumps of the hydraulic booster of a wheel with the moment 22 Нм
|
|
Fig. 2.432. Fastening уплотнтельного a flange of a regulator of phases timing
|
Remove уплотнтельный a flange of a regulator of phases timing from the left and right covers driving chains ( fig. 2.432).
|
|
Fig. 2.433. The scheme of drawing of hermetic on landing surfaces of the left casing of a chain of a drive of a cam-shaft
|
Put hermetic on pure landing surfaces of the left casing of a chain of a drive of a cam-shaft, as is shown in drawing 2.433.
The groove in the bottom landing surface 1 should be completely filled by hermetic. The hermetic platen should act over a landing surface on 1,5–2,0 mm.
The thickness of the platen of hermetic on a forward landing surface 2 should make 1,5–2,0 mm.
Tighten bolts of a new lining 3 on the left cover driving chains.
Establish the left cover of a chain of a drive and tighten bolts how it is specified more low ( fig. 2.428):
1 – tighten bolts 1–4 moment 5 Нм;
2 – tighten bolts 6 moment 10 Нм;
3 – tighten bolts 5 moment 10 Нм;
4 – tighten bolts 1–4 moment 10 Нм
|
|
Fig. 2.434. The scheme of drawing of hermetic on landing surfaces of the right casing of a chain of a drive of a cam-shaft
|
Put hermetic on pure landing surfaces of the right casing of a chain of a drive of a cam-shaft, as is shown in drawing 2.434.
The groove in the bottom landing surface 1 should be completely filled by hermetic. The hermetic platen should act over a landing surface on 1,5–2,0 mm.
The thickness of the platen of hermetic on a forward landing surface 2 should make 1,5–2,0 mm.
Tighten bolts of a new lining 3 on the right cover driving chains.
Establish the right cover of a chain of a drive and tighten bolts how it is specified more low ( fig. 2.429):
1 – tighten bolts 2, 3, 5, 6 with the moment 5 Нм;
2 – tighten bolts 1 moment 10 Нм;
3 – tighten bolts 4 moment 10 Нм;
4 – tighten bolts 2, 3, 5, 6 with the moment 10 Нм
Remove уплотнтельный a flange of a regulator of phases timing with new cuffs from the left and right covers driving chains ( fig. 2.432).
The further installation is carried out in return sequence.
Establish an epiploon crankshaftа from outside driving chains.
Establish cover ГБЦ: at the left. On the right.
Establish final collectors: the left. The right.
Establish the combined valve of giving of secondary air: at the left. On the right.
Establish a back branch pipe of a cooling liquid.
Establish the right and left hoses of system of cooling.
Establish the case of the oil filter.
Establish an inlet collector.
Establish a two-mass flywheel and-or a conducted disk.
Establish the engine.
Fill in engine oil and check up its level.
The inhaling moments
|