2.7. System of release of the fulfilled gases
THE NOTE
The demountable element of a reception pipe cannot be bent more than on 10 . There is a danger of damage.
|
Replace linings and self-locking nuts.
After installation works in final system check up, that it has been established without a tension, and the distance between elements of final system and a body was sufficient. If necessary turn off tightening a collar and level an exhaust pipe and mufflers so that to a body there was a sufficient distance and fastenings have been loaded in regular intervals.
Final collector and турбонагнетатель are uniform knot.
|