2-10-6-snyatie-i-ustanovka-kronshtejjna-dopolnitelnykh-agregatov.html
2.10.6. Removal and installation of an arm of additional unitsRemoval
Disconnect a mass cable from АКБ at the switched off ignition.
Merge cooling liquid.
Result a radiator framework in service position.
Remove полиwedge a belt.
|
Fig. 2.65. An electric socket of the gauge of level and oil temperature
|
Disconnect an electric socket on the gauge of level and oil temperatures ( fig. 2.65).
|
Fig. 2.67. Fastening of the compressor of the conditioner and штекерный a wire socket
|
Disconnect штекерный a socket of 1 wire going to electromagnetic муфте of the compressor of the conditioner ( fig. 2.67).
ATTENTION
It is forbidden to open a contour of a central air of climatic installation.
|
Turn off the compressor of the conditioner from an arm.
THE NOTE
To avoid damages of lines and hoses of a contour of a central air, it is necessary to watch that lines and hoses have been laid without a tightness, excesses and breaks.
|
Will hang out the compressor of the conditioner with the connected pipelines at the left on the car.
Turn off an electric wire 1 from the generator.
|
Fig. 2.483. An electric wire and штекерное generator connection
|
Unscrew bolts.
|
Fig. 2.485. Fastening of a belt pulley of the pump of the hydraulic booster
|
Turn off ременный a pulley of the pump of the hydraulic booster, thus ременный it is necessary to hold a pulley about the help send ( fig. 2.485).
|
Fig. 2.486. Fastening of the pump of the hydraulic booster
|
Turn off the pump of the hydraulic booster and to tie up aside, tubes remain connected ( fig. 2.486).
|
Fig. 2.479. Removal of a tension element semi wedge a belt
|
Unscrew a bolt and remove a tension element semi wedge a belt ( fig. 2.479).
Disconnect a hose of system of cooling from a connecting branch pipe 2.
Unscrew bolts of 1 connecting branch pipe and remove a branch pipe with the thermostat 4 and a sealing ring of round section 3 ( fig. 2.487).
Remove a gear belt.
Remove bypass a roller.
|
Fig. 2.488. Fastening of an arm of additional units
|
Unscrew bolts 1–6 and remove an arm of additional units ( fig. 2.488).
Installation
Installation is made in return sequence.
Check, whether on a place adjusting plugs at the upper right between an arm of auxiliary units and the block of cylinders. If is not present – insert.
Tighten bolts in sequence 1–6: at first by hand, then with the certain moment of an inhaling.
Establish a gear belt (adjust phases timing).
Establish гаситель крутильных fluctuations.
Establish a connecting branch pipe of the thermostat together with the thermostat.
Establish a tension element semi wedge a belt.
Establish the hydraulic booster pump.
Establish the generator.
Establish the conditioner compressor.
Establish полиwedge a belt.
Establish a framework of a radiator with hinged elements.
Lower an emphasis of a forward support at the expense of a body weight on the rubber buffer and tighten nuts.
Establish an overlay of a forward bumper.
Connect the storage battery.
Fill in cooling liquid.
The inhaling moments
Arm of additional units to the block of cylinders: 45 Нм.
Bypass a roller of a gear belt to an arm additional агрегатов*: 40 Нм + 90 **.
Emphasis of a forward support to a radiator framework: 28 Нм
Shlangovye collars, width of 9 mm: 3 Нм.
Shlangovye collars, width of 13 mm: 5,5 Нм.
* Replace bolts.
** 90 correspond to one quarter of a complete revolution.
|