8-3-4-ustanovka-vetrovogo-stekla.html
8.3.4. Windscreen installationAfter the termination of a spadework it is necessary to put glue.
Establish a nozzle all surface 2 on glass ( fig. 8.99).
|
THE NOTE
The section of the glutinous platen 1 is defined by an aperture of a nozzle and speed of drawing.
|
Put glue-hermetic on perimetre according to drawing 8.100.
Consider various distance to glass edge
Insert glass into an aperture by means of two double vacuum captures.
|
ATTENTION
Glass is necessary for inserting during 15 mines after glue drawing as differently its gluing properties will decrease.
|
Level glass in a cross-section direction.
The distance from edge of glass to a roof framework should make 6 mm of +0,5 mm.
|
|
Fig. 8.101. Installation of a water protective overlay
|
Water protective overlay 1 insert and press against the stop in fixing bracketх 2 only after the lapse of time of hardening of glue ( fig. 8.101).
By pressing watch that the sealing edge (arrow) of a water protective overlay adjoined to glass and has not slid off for glass edge.
Label (e.g. safety pillows) put on a new windscreen on a former place ( fig. 8.102).
The size a = 25 mm.
The size b = 10 mm.
|