6-4-11-snyatie-i-ustanovka-datchika-poperechnykh-uskorenijj-i-datchika.html
6.4.11. Removal and installation of the gauge of cross-section accelerations and the gauge of rotation round a vertical axisRemoval
Gauge ESP is in the central console under an ashtray.
Gauge ESP socket is behind the big cable plait
Turn off колпачковые nuts 2 (2 pieces) ( fig. 6.93).
The moment of an inhaling of nuts 10 Нм.
Installation
The further assemblage is carried out in return sequence.
Establish continuation of the central console.
The gauge of cross-section acceleration is susceptible to strong vibrations.
If the gauge has fallen to a floor serviceability of its work more is not provided. The further use of the gauge is not supposed.
|