3.1.9. The mechanism of deenergizing of coupling
|
Fig. 3.26. The mechanism of deenergizing of coupling: 1 – the working cylinder of coupling; 2 – the screw with internal шестигранником, 23 Нм; 3 – the holder; 4 – a pusher; 5 – выжимной the bearing; 6 – the screw, 25 Нм; 7 – a lamellar spring; 8 – the lever of deenergizing of coupling; 9 – the screw, 15 Нм; 10 – a directing sleeve; 11 – shaft consolidation; 12 – an intermediate element; 13 – a transmission
|
Dismantle of a sealing cuff of a power shaft
|
Fig. 3.27. Extraction of consolidation of a shaft
|
Cautiously pick up by means of a screw-driver and take shaft consolidation ( fig. 3.27).
THE NOTE
Do not damage a working surface of consolidation of a power shaft.
|
Installation of a sealing cuff of a power shaft
Fill space of a new sealing ring of a primary shaft between sealing and working edges a thin layer of greasing.
On teeths of a primary shaft hardly pull a thin isolating hose.
|
Fig. 3.28. Запрессовка a sealing ring of a power shaft
|
Insert a sealing ring of a power shaft ( fig. 3.28).
Serial depth запрессовки: 3,5 mm.
Repair depth запрессовки not new primary shaft of 4,5 mm.
Remove isolating hose.
Remove the lever of deenergizing of coupling
|
Fig. 3.29. Removal of the lever of deenergizing of coupling with выжимным the bearing
|
Turn off the screw 1, remove a lamellar spring 2 and wring out a clamp back ( fig. 3.29).
Remove the lever of deenergizing of coupling 4 with выжимным the bearing 3 ( fig. 3.29).
Deduce uvulas выжимного the bearing on the deenergizing lever.
Establish the lever of deenergizing of coupling
Before installation of the lever of deenergizing of coupling of a surface прилегания a pusher of the working cylinder смажте a thin layer of copper greasing.
Establish the lever of deenergizing of coupling And in the prorate With and fix (fastening In it becomes visible).
Establish a lamellar spring and tighten the screw with the moment 25 Нм.
Check of the bearing of deenergizing of coupling with the pasted plastic ring
Distinctive sign: an inside of a plastic ring with three fixing ledges ( fig. 3.30).
At removal of a box of transfers / выжимного the bearing the plastic ring can be disconnected from выжимного the bearing. It is not at the bottom for replacement выжимного of the bearing.
Paste the disconnected plastic ring before installation of a transmission by glue to a bearing ring.
Three rectangular ledges of a plastic ring should enter into grooves of a ring of the bearing.
THE NOTE
If developments on a plastic ring are deeper 0,8 mm, выжимной the bearing is subject to replacement.
|
Check of the bearing of deenergizing of coupling with the established plastic ring
|
Fig. 3.31. Check of the bearing of deenergizing of coupling with the established plastic ring
|
Distinctive sign: a plastic ring with fixing ledges.
THE NOTE
With the disconnected plastic ring 1 it is necessary to replace the bearing of deenergizing of coupling.
|
Wear tracks 2 on a plastic ring 1 are deeper 0,8 mm testify that 3 it is necessary to replace the bearing of deenergizing of coupling.
|