3.2.8. Removal and installation of a pillow of a transmissionRemoval
Loosen the clamps 3 (at presence) also remove back шумоизоляционный the screen In ( fig. 3.1).
|
Fig. 3.70. Tightening collars of system of release ОГ
|
Disconnect system of release ОГ from a tightening collar ( fig. 3.70).
|
Fig. 3.71. Installation of the wooden prorate
|
Lower a check point the lift of the power unit. Enclose the wooden prorate 1 between a check point and the check point lift ( fig. 3.71).
|
Fig. 3.72. Fastening of the cross-section lever
|
At first turn away bolts 3, then bolts 2 cross-section levers ( fig. 3.72).
Slightly lower a check point.
Turn on both nuts 1 and not up to the end remove the cross-section lever.
Turn away a check point pillow.
Installation
Installation is carried out in return sequence.
|
Fig. 3.73. Fastening of a pillow of a check point
|
Establish a check point pillow on a check point ( fig. 3.73).
Tighten bolts taking into account the inhaling moment.
Tighten the cross-section lever to a pillow of a check point 1.
Raise a check point until it will be impossible to screw bolts 2 ( fig. 3.72).
Preliminary wrap bolts 2, then bolts 3 ( fig. 3.72).
Elements of system of release ОГ level without a tension.
Establish шумоизоляционный the screen under a check point.
The inhaling moments
Check point pillow to KPP:23 Нм.
The cross-section lever to a check point pillow: 23 Нм.
Tightening a collar of a reception pipe: 40 Нм.
|