2-7-2-snyatie-i-ustanovka-priemnojj-truby.html
2.7.2. Removal and installation of a reception pipe
Loosen the tightening a collar also shift back ( fig. 2.84).
Separate a reception pipe and the catalyst.
Turn off a bolt 1 on an arm of a reception pipe and remove a pipe ( fig. 2.85).
The inhaling moments
Reception pipe to катализатору* – 40 Нм **.
Support to kpp / to the RECEPTION pipe – 40 Нм.
Tightening a collar – 23 Нм.
* Replace a bolt or a nut.
** Grease adjusting pins of a final collector or a carving of a ljamda-probe with thermosteady paste; thermosteady paste.
|